The construction of a normal hexane solvent unit with grades of 52% and 85% including performing all basic design and detailed design services, purchasing all required equipment and items and spare parts, construction, installation, implementation, pre-commissioning, start-up and operation and other executive services related to the mechanical, civil, structure, construction, drawing, electrical and precision instruments of the project, conducting HAZOP studies and HAZID and so on.